Moving along - With help from Tiphani and Justin we have the water heater installed and the storage cupboard covered and taped, and trim boards stained. Ben and our friend John got the door installed this past weekend and I have spent much of this past week staining more trim boards.
staining trim boards |
our refrigerator |
Another aspect of this project is downsizing our personal belongings so that we fit our family of 3 (Tumnus included) comfortably into 135 square feet without putting alot in storage. This means taking stock of which belongings are worth keeping, which will need to come to the tiny house with us, and which we can part with. At this point we have an ever-growing garage sale pile in out living room.